Shaanxi Xianyang Guotang Wastewater Treatment Project


Release time:

2026-01-26

The Guotang Wastewater Treatment Plant in Xianyang City was constructed in 2014. Based on estimates of reclaimed water usage within the High-Tech Zone, the current demand for reclaimed water in the High-Tech Zone is approximately 18,200 m³/day. This phase is designed with a capacity of 20,000 m³/day, corresponding to the first stage. The long-term design capacity will be 80,000 tons/day. The quality of the treated water meets the following standards: SDI < 3 and turbidity < 0.1 NTU.

Shaanxi Xianyang Guotang Wastewater Treatment Project

The Guotang Wastewater Treatment Plant in Xianyang City was constructed in 2014. Based on estimates of reclaimed water usage within the High-Tech Zone, the current demand for reclaimed water in the High-Tech Zone is approximately 18,200 m³/day. This phase of the project is designed with a capacity of 20,000 m³/day, corresponding to the first-phase stage. The long-term design capacity will be 80,000 tons/day. The quality of the treated water meets the following standards: SDI < 3 and turbidity < 0.1 NTU.

Previous page: